Jaw Crusher Improper Feeding

Jaw Crusher Improper Feeding

Guide: The jaw crusher needs to feed the material before it can be crushed. If the material is not properly fed, the crushing may not be carried out. Here is the hazard of improper feeding.

Regarding the production process of the jaw crusher, the importance of operation is self-evident. Many manufacturers will provide operational training, which is to standardize the operation. Otherwise, the phenomenon that production cannot be carried out will occur, and the operation will affect the production process. One of the core factors is as important as quality and performance. One of the operations is the feeding, that is, the addition of materials. Only when the material is added can the production be carried out. If the material is improperly fed, what damage will it cause to the production?

The so-called improper feeding refers to the improper operation of adding materials, including the unreasonable nature of the added materials, and the unreasonable feeding speed. The following analysis is made on these aspects:

The first is that the nature of the added material is unreasonable.

  1. 1. If the hardness of the material added to the jaw crusher is too large, the damage caused by the eccentric shaft and the wear of other internal parts will increase, of course, the efficiency is inevitable;
  2. 2. If the humidity or viscosity of the material added to the jaw crusher is too large, the hazard is blockage. At this time, it is necessary to stop the machine for cleaning, which seriously affects the production process;
  3. 3. If the size of the material added to the jaw crusher is unreasonable, it will increase the processing difficulty of the equipment too much, and the phenomenon of smashing will occur if it is too small;
  4. In addition, when the nature of the feed is unreasonable, in addition to the change in efficiency and wear, it may also cause the vibration of the jaw crusher to be intensified, so it is very important for the quality of the feed;

Secondly, the feed rate is unreasonable

Unreasonable feeding speed is mainly too large or too small. If it is too large, it will cause the jaw crusher to be blocked due to production. If it is too small, the equipment will be idling and the efficiency will drop. In short, whether the feeding speed is large or small, it will be Causing adverse effects on production, so it is very important for speed setting; The article analyzes the summary of the hazards of the jaw crusher due to improper feeding. It can be seen from the above analysis that the damage is mainly caused by increased wear, reduced efficiency, blockage, and increased vibration. For these aspects, it must be Strictly follow the requirements of the jaw crusher to ensure the smooth production.

Equipment

B6X Belt Conveyor
B6X Belt Conveyor
XSD Sand Washer
XSD Sand Washer
F5X Vibrating Feeder
F5X Vibrating Feeder
S5X Vibrating Screen
S5X Vibrating Screen
K Track-type Mobile Crusher
K Track-type Mobile Crusher

Industry News

Request A Quotation